Development of Yanoon BioTech Jinjing Research&Development Base
Release Time:2019-05-16Development of Yanoon BioTech Jinjing Research&Development Base
08-05-2019. The office building of Jinjing base.
08-05-2019. The living building of Jinjing base.
02-04-2019. The scenery of Jinjing base.
02-04-2019. The scenery of Jinjing base.
26-04-2019. Relaying gravel on roads completed.
19-03-2019. Relaying gravel on roads of Jinjing base.
19-03-2019. Relaying turf completed.
11-03-2019. Relaying turf at both sides of main road.
06-11-2018. The second laboratory room of Jinjing base.
06-11-2018. The second laboratory room of Jinjing base.
29-10-2018. One laboratory room of Jinjing base.
29-10-2018. One office room of Jinjing base.
26-10-2018. The office building furniture layout.
22-10-2018. The greenhouse construction completed.
22-10-2018. The construction of refrigeration storage completed and in use.
16-10-2018. The scenery of Jinjing base.
16-10-2018. The scenery of Jinjing base.
16-10-2018. The scenery of Jinjing base.
12-10-2018. The greenhouse construction of Jinjing base.
5-10-2018. The greenhouse construction of Jinjing base.
15-09-2018. The bedroom of living building.
15-09-2018. The hall of living building of Jinjing base.
15-09-2018. The living building decoration completed.
15-09-2018. Decorating office building of Jinjing base.
15-09-2018. The concrete road construction completed.
13-09-2018. The concrete road construction of Jinjing base.
10-09-2018. The laboratory construction of Jinjing base.
16--08-2018. The construction of refrigeration storage of Jinjing base.
26-07-2018. The kiwifruit demonstration orchard of Jinjing base.
26-06-2018. Decorating living building of Jinjing base.
05-06-2018. The Entrance of Jinjing R&D base.
20-04-2018. Greening construction of water reservoir.
04-04-2018. Slope protection construction of the water reservoir.
30-03-2018. Living building construction of Jinjing base.
30-03-2018. Greening construction of Jinjing base.
23--01-2018. Dredging the silt and slope protection construction of the water reservoir.
22-01-2018. Living building construction of Jinjing base.
11-01-2018. Office building construction of Jinjing base.
26-12-2017. Living building construction of Jinjing base.
26-12-2017. Office building construction of Jinjing base.
12-11-2017. Living building construction of Jinjing base.
12-11-2017. Office building construction of Jinjing base.
24-10-2017. Living building construction of Jinjing base.
24-10-2017. Office building construction of Jinjing base.
27-9-2017. Living building construction of Jinjing base.
23-9-2017. Living building construction of Jinjing base.
15-09-2017. Office building construction of Jinjing base.
11-09-2017. Office building construction of Jinjing base.
24-08-2017. Kiwifruit of demonstration zone.
24-07-2017. Kiwifruit of demonstration zone.
10-07-2017. Fence construction around orchard and gravel paving of main road.
24-05-2017. Kiwifruit of demonstration zone.
17-04-2017. Kiwifruit blossoming of demonstration zone.
08-12-2016. Organic fertilizer application in winter.
02-08-2016. Kiwifruit of demonstration zone going through continous 40 days of high temperature and drought.
24-05-2016. Kiwifruit of demonstration zone.
17-05-2016. A corner of kiwifruit breeding orchard.
05-05-2016. Kiwifruit bearing fruits of demonstration zone.
12-04-2016. Kiwifruit blossoming of demonstration zone.
02-11-2015. Installation of concrete posts completed of zone E.
20-10-2015. Organic fertilizer application, soil tilling for kiwifruit breeding orchard zone E.
20-10-2015. Soil preparation for feijoa.
07-08-2015. Installation of spray irrigation system completed.
07-08-2015. The kiwifruit fruits of breeding orchard.
12-06-2015. The growth of kiwifruit plants after grafting.
28-04-2015. The kiwifruit plants of breeding orchard bloom.
10-01-2015. Dredging the silt of dam.
07-01-2015. Grafting kiwifruit scions.
03-07-2014. Kiwifruit plants are climbing up to the wire frame.
30-04-2014. Mowing the ryegrass and rapes as green manure.
10-04-2014. The construction of the water reservoir dam.
02-04-2014. The growth of kiwifruit plants.
10-03-2014. The growth of ryegrass and rapes as green manure.
10-03-2014. During 10-14 March 2014, nursery plants of kiwifruit and Joyfruit were planted.
10-03-2014. Installation of concrete posts completed.
03-01-2014. Installation of concrete posts continued.
27-12-2013. Installation of concrete posts started.
08-12-2013. At the beginning of December 2013, construction of the dam of water reservoir was started.
08-12-2013. During 5-11 December 2013, a second round of organic fertilizer application, soil tilling, and green manure (a mixture of rapeseed and ryegrass) seed sowing were carried out.
02-12-2013. From October to December 2013, land re-contouring for orchard blocks and office building area was carried out.
28-04-2013. During 26-28 April 2013, a large quantity of organic fertilizer was applied, then the soil was tilled again using a rotating tiller; the seeds of green manure Vigna sinensis were sown.
09-03-2013. From February to April 2013, the soil was tilled to a depth of 100-120 cm, and the tea trees were buried underneath.
03-11-2012. The original appearance of Jinjing base, a tea plantation.