Development of Yanoon BioTech Jinjing Research&Development Base

Release Time:2019-05-16

Development of Yanoon BioTech Jinjing Research&Development Base

08-05-2019. The office building of Jinjing base.

08-05-2019. The living building of Jinjing base.

02-04-2019. The scenery of Jinjing base.

02-04-2019. The scenery of Jinjing base.

26-04-2019. Relaying gravel on roads completed.

19-03-2019. Relaying gravel on roads of Jinjing base.

19-03-2019. Relaying turf completed.

11-03-2019. Relaying turf at both sides of main road.

06-11-2018. The second laboratory room of Jinjing base.

06-11-2018. The second laboratory room of Jinjing base.

29-10-2018. One laboratory room of Jinjing base.

29-10-2018. One office room of Jinjing base.

26-10-2018. The office building furniture layout.

22-10-2018. The greenhouse construction completed.

22-10-2018. The construction of refrigeration storage completed and in use.

16-10-2018. The scenery of Jinjing base.

16-10-2018. The scenery of Jinjing base.

16-10-2018. The scenery of Jinjing base.

12-10-2018. The greenhouse construction of Jinjing base.

5-10-2018. The greenhouse construction of Jinjing base.

15-09-2018. The bedroom of living building.

15-09-2018. The hall of living building of Jinjing base.

15-09-2018. The living building decoration completed.

15-09-2018. Decorating office building of Jinjing base.

15-09-2018. The concrete road construction completed.

13-09-2018. The concrete road construction of Jinjing base.

10-09-2018. The laboratory construction of Jinjing base.

16--08-2018. The construction of refrigeration storage of Jinjing base.

26-07-2018. The kiwifruit demonstration orchard of Jinjing base.

26-06-2018. Decorating living building of Jinjing base.

05-06-2018. The Entrance of Jinjing R&D base.

20-04-2018. Greening construction of water reservoir.

04-04-2018. Slope protection construction of the water reservoir.

30-03-2018. Living building construction of Jinjing base.

30-03-2018. Greening construction of Jinjing base.

23--01-2018. Dredging the silt and slope protection construction of the water reservoir.

22-01-2018. Living building construction of Jinjing base.

11-01-2018. Office building construction of Jinjing base.

26-12-2017. Living building construction of Jinjing base.

26-12-2017. Office building construction of Jinjing base.

12-11-2017. Living building construction of Jinjing base.

12-11-2017. Office building construction of Jinjing base.

24-10-2017. Living building construction of Jinjing base.

24-10-2017. Office building construction of Jinjing base.

27-9-2017. Living building construction of Jinjing base.

23-9-2017. Living building construction of Jinjing base.

15-09-2017. Office building construction of Jinjing base.

11-09-2017. Office building construction of Jinjing base.

24-08-2017. Kiwifruit of demonstration zone.

24-07-2017. Kiwifruit of demonstration zone.

10-07-2017. Fence construction around orchard and gravel paving of main road.

24-05-2017. Kiwifruit of demonstration zone.

17-04-2017. Kiwifruit blossoming of demonstration zone.

08-12-2016. Organic fertilizer application in winter.

02-08-2016. Kiwifruit of demonstration zone going through continous 40 days of high temperature and drought.

24-05-2016. Kiwifruit of demonstration zone.

17-05-2016. A corner of kiwifruit breeding orchard.

05-05-2016. Kiwifruit bearing fruits of demonstration zone.

12-04-2016. Kiwifruit blossoming of demonstration zone.

02-11-2015. Installation of concrete posts completed of zone E.

20-10-2015. Organic fertilizer application, soil tilling for kiwifruit breeding orchard zone E.

20-10-2015. Soil preparation for feijoa.

07-08-2015. Installation of spray irrigation system completed.

07-08-2015. The kiwifruit fruits of breeding orchard.

12-06-2015. The growth of kiwifruit plants after grafting.

28-04-2015. The kiwifruit plants of breeding orchard bloom.

10-01-2015. Dredging the silt of dam.

07-01-2015. Grafting kiwifruit scions.

03-07-2014. Kiwifruit plants are climbing up to the wire frame.

30-04-2014. Mowing the ryegrass and rapes as green manure.

10-04-2014. The construction of the water reservoir dam.

02-04-2014. The growth of kiwifruit plants.

10-03-2014. The growth of ryegrass and rapes as green manure.

10-03-2014. During 10-14 March 2014, nursery plants of kiwifruit and Joyfruit were planted.

10-03-2014. Installation of concrete posts completed.

03-01-2014. Installation of concrete posts continued.

27-12-2013. Installation of concrete posts started.

08-12-2013. At the beginning of December 2013, construction of the dam of water reservoir was started.

08-12-2013. During 5-11 December 2013, a second round of organic fertilizer application, soil tilling, and green manure (a mixture of rapeseed and ryegrass) seed sowing were carried out.

02-12-2013. From October to December 2013, land re-contouring for orchard blocks and office building area was carried out.

28-04-2013. During 26-28 April 2013, a large quantity of organic fertilizer was applied, then the soil was tilled again using a rotating tiller; the seeds of green manure Vigna sinensis were sown.

09-03-2013. From February to April 2013, the soil was tilled to a depth of 100-120 cm, and the tea trees were buried underneath.

03-11-2012. The original appearance of Jinjing base, a tea plantation.